Q: The State Highway Department is considering a bypass loop that is expected
The State Highway Department is considering a bypass loop that is expected to save motorists $820,000 per year in gasoline and other automobile each year. The cost of the loop will be $9,000,000. (a)...
See AnswerQ: A rural, agriculture-based city that has 17,000
A rural, agriculture-based city that has 17,000 households is required to install treatment systems for the removal of arsenic and other harmful chemicals from its drinking water. The annual cost is p...
See AnswerQ: An Army Corps of Engineers project for improving navigation on the Ohio
An Army Corps of Engineers project for improving navigation on the Ohio River will have an initial cost of $6,500,000 and annual maintenance of $130,000. Benefits for barges and paddle wheel touring b...
See AnswerQ: A consultant, after 3 months of work, reported that the
A consultant, after 3 months of work, reported that the modified B/C ratio for a city-owned hospital heliport project is 1.7. If the initial cost is $1 million and the annual benefits are $150,000, wh...
See AnswerQ: The B/C ratio for a mosquito control program proposed by
The B/C ratio for a mosquito control program proposed by the Harris County Department of Health is reported to be 2.1. The person who prepared the report stated that the annual health benefits were es...
See AnswerQ: Calculate the B/C ratio for the following cash flow estimates
Calculate the B/C ratio for the following cash flow estimates at a discount rate of 10% per year. Is the project justified? Item……………………………… Estimate PW of benefits, $...................... 3,800,000...
See AnswerQ: In United States airspace, the average number of commercial aircraft in
In United States airspace, the average number of commercial aircraft in the sky on an average morning is 4000. There are another 16,000 planes on the ground. Aerospace company Rockwell-Collins develop...
See AnswerQ: When red light cameras are installed at high-risk intersections,
When red light cameras are installed at high-risk intersections, rear-end collisions go up, but all other types of accidents go down, including those involving pedestrians. Analysis of traffic acciden...
See AnswerQ: Two alternatives, identified as X and Y, are evaluated using
Two alternatives, identified as X and Y, are evaluated using the B/C method. Alternative Y has a higher total cost than X. If the B/C ratios are 1.2 and 1.0 for alternatives X and Y, respectively, whi...
See AnswerQ: The city engineer and economic development directors are evaluating two sites for
The city engineer and economic development directors are evaluating two sites for construction of a multipurpose sports arena. The sites are downtown (DT) and southwest (SW) of the metropolitan area....
See Answer