Maximum Metal Recycling and Salvage receives the opportunity to salvage scrap metal and other materials from an old industrial site. The current owners of the site will sign over the site to Maximum at no cost. Maximum intends to extract scrap metal at the site for 24 months and then will clean up the site, return the land to useable condition, and sell it to a developer. Projected costs associated with the project follow:

Ignore the time value of money.
Required:
1. Assuming that Maximum expects to salvage 70,000 tons of metal from the site, what is the total project life-cycle cost?
2. Suppose Maximum can sell the metal for $110 per ton and wants to earn a profit (before taxes) of $30 per ton. At what price must Maximum sell the land at the end of the project to achieve its target profit per ton?
3. Now suppose Maximum can only sell the metal for $100 per ton and the land at $110,000 less than what you calculated in requirement 2. If Maximum wanted to maintain the same markup percentage on total project life-cycle cost as in requirement 2, by how much would the company have to reduce its total project life-cycle cost?
Fixed Variable Months 1–24 Metal extraction and processing $2,000 per month $80 per ton Rent on temporary buildings $1,000 per month $6,000 per month $20,000 per month $23,000 total $80,000 total Months 1-27 Administration Months 25-27 Clean-up Land restoration Cost of selling land |||||
> Compton Associates is an architectural firm that has been in practice only a few years. Because it is a relatively new firm, the market for the firm’s services is very competitive. To compete successfully, Compton must deliver quality s
> Hoffman Company, as you know, is a manufacturer of car seats. Each car seat passes through the assembly department and testing department. This problem focuses on the testing department. Direct materials are added when the testing department process is 9
> Required: 1. Do Problem 17-36 using the FIFO method of process costing. Explain any difference between the cost per equivalent unit in the assembly department under the weighted-average method and the FIFO method. 2. Should Hoffman’s m
> Required: Prepare a set of summarized journal entries for all October 2017 transactions affecting Work in Process— Assembly. Set up a T-account for Work in Process—Assembly and post your entries to it. From problem 36
> Hoffman Company manufactures car seats in its Boise plant. Each car seat passes through the assembly department and the testing department. This problem focuses on the assembly department. The process-costing system at Hoffman Company has a single direct
> Louisville Sports manufactures baseball bats for use by players in the major leagues. A critical requirement for elite players is that each bat they use have an identical look and feel. As a result, Louisville uses a dedicated process to produce bats to
> Kardash Cosmetics purchases flowers in bulk and processes them into perfume. From a certain mix of petals, the firm uses Process A to generate Seduction, its high-grade perfume, as well as a certain residue. The residue is then further treated, using Pro
> Arnold Technologies manufactures a variety of flash memory chips at its main plant in Taiwan. Some chips are sold to makers of electronic equipment while others are embedded into consumer products for sale under Arnold’s house label, AT
> Newcastle Mining Company (NMC) mines coal, puts it through a one-step crushing process, and loads the bulk raw coal onto river barges for shipment to customers. NMC’s management is currently evaluating the possibility of further proces
> Mountainair Construction Company (MCC) crushes boulders to obtain decorative rock, which they sell through various outlets. The process produces three grades of rock, which are viewed as joint products: Red Rock, a high-end decorative rock; White Rock, c
> The accountant for SRC needs to record the information about the joint and byproducts in the general journal, but is not sure what the entries should be. The company has hired you as a consultant to help its accountant. Required: 1. Show journal entries
> Refer to Exercise 12-25. Required: 1. Calculate the amount and cost of (a) unused manufacturing capacity and (b) unused selling and customer-service capacity at the beginning of 2017 based on actual production and actual number of customers
> The Seattle Recycling Company (SRC) purchases old water and soda bottles and recycles them to produce plastic covers for outdoor furniture. The company processes the bottles in a special piece of equipment that first melts, then reforms the plastic into
> SW Flour Company has decided that their bread flour may sell better if it was marketed for gourmet baking and sold with infused spices. This would involve additional cost for the spices of $0.80 per cup. Each cup could be sold for $5.50. Required: 1. I
> SW Flour Company buys 1 input of standard flour and refines it using a special sifting process to 3 cups of baking flour and 9 cups of bread flour. In May 2017, SW bought 12,000 inputs of flour for $89,000. SW spent another $47,800 on the special sifting
> Liverpool Sawmill, Inc. (LSI) purchases logs from independent timber contractors and processes the logs into three types of lumber products: â– Studs for residential buildings (walls, ceilings) â– Decorative pieces (fir
> The Rich and Creamy Edibles Factory manufactures and distributes chocolate products. It purchases cocoa beans and processes them into two intermediate products: chocolate-powder liquor base and milk-chocolate liquor base. These two intermediate products
> The Chicago Oil Company buys crude vegetable oil. Refining this oil results in four products at the splitoff point: A, B, C, and D. Product C is fully processed by the splitoff point. Products A, B, and D can individually be further refined into Super A,
> Garden Labs produces a drug used for the treatment of arthritis. The drug is produced in batches. Chemicals costing $50,000 are mixed and heated, then a unique separation process extracts the drug from the mixture. A batch yields a total of 3,000 gallons
> Ballantine Corporation has two operating departments: Eastern Department and Western Department. Each of the operating departments uses the services of the company’s two support departments: Engineering and Information Technology. Addit
> Boca Resorts (BR) operates a five-star hotel with a worldclass spa. BR has a decentralized management structure, with three divisions: â– Lodging (rooms, conference facilities) â– Food (restaurants and in-room service)
> Sportz, Inc., manufactures athletic shoes and athletic clothing for both amateur and professional athletes. The company has two product lines (clothing and shoes), which are produced in separate manufacturing facilities; however, both manufacturing facil
> Suppose that during 2017, the market for Stanmore’s special-purpose machines grew by 3%. All increases in market share (that is, sales increases greater than 3%) are the result of Stanmore’s strategic actions. Required: Calculate how much of the change
> Magic Systems, Inc., sells computer hardware to end consumers. The CX30 is sold as a “bundle,” which includes three hardware products: a personal computer (PC) tower, a 26-inch monitor, and a color laser printer. Each
> Tate Inc. and Booth Inc. are two small manufacturing companies that are considering leasing a cutting machine together. If Tate rents the machine on its own, it will cost $26,000. If Booth rents the machine alone, it will cost $14,000. If they rent the m
> The Martinez Company has two products. Product 1 is manufactured entirely in department X. Product 2 is manufactured entirely in department Y. To produce these two products, the Martinez Company has two support departments: A (a materials-handling depart
> The Eastern Summit Company has prepared department overhead budgets for budgeted-volume levels before allocations as follows: Management has decided that the most appropriate inventory costs are achieved by using individual- department overhead rates. T
> Central University completed construction of its newest administrative building at the end of 2017. The University’s first employees moved into the building on January 1, 2018. The building consists of office space, common meeting rooms
> Fang Inc. produces and sells DVDs to business people and students who are planning extended stays in China. It has been very successful with two DVDs: Beginning Mandarin and Conversational Mandarin. It is introducing a third DVD, Reading Chinese Characte
> Preston Department Store has a new promotional program that offers a free gift-wrapping service for its customers. Preston’s customer-service department has practical capacity to wrap 5,000 gifts at a budgeted fixed cost of $4,950 each
> KC Corporation manufactures an air-freshening device called GoodAir, which it sells to six merchandising firms. The list price of a GoodAir is $30, and the full manufacturing costs are $18. Salespeople receive a commission on sales, but the commission is
> The Robin’s Basket operates a chain of Italian gelato stores. Although the Robin’s Basket charges customers the same price for all flavors, production costs vary, depending on the type of ingredients. Budgeted and actu
> Miami Infonautics’ senior vice president of marketing prepared his budget at the beginning of the third quarter assuming a 25% market share based on total sales. Foolinstead Research estimated that the total handheld-organizer market would reach sales of
> Refer to Exercise 12-25. From exercise 25: Stanmore Corporation makes a special-purpose machine, D4H, used in the textile industry. Stanmore has designed the D4H machine for 2017 to be distinct from its competitors. It has been generally regarded as a
> Miami Infonautics, Inc., produces handheld Windows CEâ„¢-compatible organizers. Miami Infonautics markets three different handheld models: PalmPro is a souped-up version for the executive on the go, PalmCE is a consumer-oriented version,
> Vocal Speakers makes wireless speakers that are sold to different customers in two main distribution channels. Recently, the company’s profitability has decreased. Management would like to analyze the profitability of each channel based
> The Insurance Company insures homeowners in three regions of the United States: Eastern, Midwest, and South. In the past year, several hurricanes hit the Southern region of the United States, requiring payments to insured homeowners. Management of the c
> Forber Bakery makes baked goods for grocery stores and has three divisions: bread, cake, and doughnuts. Each division is run and evaluated separately, but the main headquarters incurs costs that are indirect costs for the divisions. Costs incurred in the
> Cathy Carpenter, controller of the Sweet and Salty Snacks is preparing a presentation to senior executives about the performance of its four divisions. Summary data related to the four divisions for the most recent year are as follows: Under the existin
> Louise Newman operates Interiors by Louise, an interior design consulting and window treatment fabrication business. Her business is made up of two different distribution channels, a consulting business in which Louise serves two architecture firms (Adam
> Mississippi Manufacturing makes a component called B2040. This component is manufactured only when ordered by a customer, so Mississippi keeps no inventory of B2040. The list price is $112 per unit, but customers who place “largeâ
> Green Paper Delivery has decided to analyze the profitability of five new customers. It buys recycled paper at $20 per case and sells to retail customers at a list price of $26 per case. Data pertaining to the five customers are: Green Paper Delivery&ac
> Bracelet Delights is a new company that manufactures custom jewelry. Bracelet Delights currently has six customers referenced by customer number: 01, 02, 03, 04, 05, and 06. Besides the costs of making the jewelry, the company has the following activitie
> Mary Martin recently started a job as an administrative assistant in the cost accounting department of Needham Manufacturing. New to the area of cost accounting, Mary is puzzled by the fact that one of Needham’s manufactured products, S
> Stanmore Corporation makes a special-purpose machine, D4H, used in the textile industry. Stanmore has designed the D4H machine for 2017 to be distinct from its competitors. It has been generally regarded as a superior machine. Stanmore presents the follo
> Sylvan Creations designs, manufactures, and sells modern wood sculptures. Sandra Johnson is an artist for the company. Johnson has spent much of the past month working on the design of an intricate abstract piece. Jim Chase, product development manager,
> Instyle Interior Designs has been requested to prepare a bid to decorate four model homes for a new development. Winning the bid would be a big boost for sales representative Jim Doogan, who works entirely on commission. Sara Groom, the cost accountant f
> Global Airlines is a major low-price airline carrier for both domestic and international travel. The company guarantees the “lowest price” ticket for travel within the United States. The “lowest price” ticket guarantee does not apply for travel on Monday
> Costal Airways is about to introduce a daily round-trip flight from New York to Los Angeles and is determining how to price its round-trip tickets. The market research group at Costal Airways segments the market into business and pleasure travelers. It p
> Assume the fabric costs $4.00 per yard in 2017 and $4.10 per yard in 2016. From problem 43: Gable Company manufactures wallets from fabric. In 2016, Gable made 2,160,000 wallets using 1,600,000 yards of fabric. In 2016, Gable has capacity to make 2,448
> Gable Company manufactures wallets from fabric. In 2016, Gable made 2,160,000 wallets using 1,600,000 yards of fabric. In 2016, Gable has capacity to make 2,448,000 wallets and incurs a cost of $8,568,000 for this capacity. In 2017, Gable plans to make 2
> WrightAir is a no-frills airline that services the Midwest. Its mission is to be the only short-haul, low-fare, high-frequency, pointto-point carrier in the Midwest. However, there are several large commercial carriers offering air transportation, and Wr
> Comtex Company provides cable and Internet services in the greater Boston area. There are many competitors that provide similar services. Comtex believes that the key to financial success is to offer a quality service at the lowest cost. Comtex currently
> Gardini Chocolates makes c ustom-labeled, high-quality, specialty candy bars for special events and advertising purposes. The company employs several chocolatiers who were trained in Germany. The company offers many varieties of chocolate, including milk
> Gianni & Sons buys T-shirts in bulk, applies its own trendsetting silk-screen designs, and then sells the T-shirts to a number of retailers. Gianni wants to be known for its trendsetting designs, and it wants every teenager to be seen in a distinctiv
> Vic Corporation manufactures various types of color laser printers in a highly automated facility with high fixed costs. The market for laser printers is competitive. The various color laser printers on the market are comparable in terms of features and
> Petrocal, Inc., refines gasoline and sells it through its own Petrocal gas stations. On the basis of market research, Petrocal determines that 60% of the overall gasoline market consists of “service-oriented customers,”
> Following is a random-order listing of perspectives, strategic objectives, and performance measures for the balanced scorecard. Required: For each perspective, select those strategic objectives from the list that best relate to it. For each strategic ob
> As a result of the actions taken, quality has significantly improved in 2017 while rework and unit costs of the Orlicon have decreased. Scott has reduced manufacturing capacity because capacity is no longer needed to support rework. Scott has also lowere
> Suppose that during 2017, the market for DVD players grew 10%. All increases in market share (that is, sales increases greater than 10%) and decreases in the selling price of the Orlicon are the result of Scott’s strategic actions. Required: Calculate
> As a result of the actions taken, quality has significantly improved in 2017 while rework and unit costs of the Orlicon have decreased. Scott has reduced manufacturing capacity because capacity is no longer needed to support rework. Scott has also lowere
> Della Simpson, Inc., sells two popular brands of cookies: Della’s Delight and Bonny’s Bourbon. Della’s Delight goes through the Mixing and Baking departments, and Bonny’s Bourbon, a
> Nelson River Tours, a division of Old World Travel, offers two types of guided fishing tours, Beginner and Advanced. Operating income for each tour type in 2017 is as follows: The equipment has a zero disposal value. Guide wages, supplies, and vehicle f
> Ainsley Corporation has four operating divisions. The budgeted revenues and expenses for each division for 2017 follows: Further analysis of costs reveals the following percentages of variable costs in each division: Closing down any division would res
> Damon Furniture (DF) produces fiberglass doors in two processes: molding and finishing. DF is currently producing two models: Masoline and Aldernite. Production in the molding department is limited by the amount of materials available. Production in the
> Suppose that the market for silk-screened T-shirts grew by 10% during 2017. All increases in sales greater than 10% are the result of Gianni’s strategic actions. From exercise 21: Gianni & Sons buys T-shirts in bulk, applies its o
> Washington Industries manufactures electronic testing equipment. Washington also installs the equipment at customers’ sites and ensures that it functions smoothly. Additional information on the manufacturing and installation departments
> Gormley Precision Tools makes cutting tools for metalworking operations. It makes two types of tools: A6, a regular cutting tool, and EX4, a high precision cutting tool. A6 is manufactured on a regular machine, but EX4 must be manufactured on both the re
> Wechsler Company produces three products: A130, B324, and C587. All three products use the same direct material, Brac. Unit data for the three products are: The demand for the products far exceeds the direct materials available to produce the products.
> The Lexington Company produces gas grills. This year’s expected production is 20,000 units. Currently, Lexington makes the side burners for its grills. Each grill includes two side burners. Lexington’s management accou
> Denver Engineering manufactures small engines that it sells to manufacturers who install them in products such as lawn mowers. The company currently manufactures all the parts used in these engines but is considering a proposal from an external supplier
> The Wild Orchid Corporation is working at full production capacity producing 13,000 units of a unique product, Everlast. Manufacturing cost per unit for Everlast is: Direct materials………………………………….$10 Variable direct manufacturing labor………..2 Manufacturin
> Jason Wu operates Exclusive Limousines, a fleet of 10 limousines used for weddings, proms, and business events in Washington, D.C. Wu charges customers a flat fee of $250 per car taken on contract plus an hourly fee of $80. His income statement for May f
> Gavin Martin, the general manager of Oregano Software, must decide when to release the new version of Oregano’s spreadsheet package, Easyspread 2.0. Development of Easyspread 2.0 is complete; however, the diskettes, compact discs, and u
> Riverside Clippers Corp manufactures garden tools in a factory in Taneytown, Maryland. Recently, the company designed a collection of tools for professional use rather than consumer use. Management needs to make a good decision about whether to produce t
> Susan Smith manages the Wexford plant of Sanchez Manufacturing. A representative of Darnell Engineering approaches Smith about replacing a large piece of manufacturing equipment that Sanchez uses in its process with a more efficient model. While the repr
> Required: Refer to Exercise 12-21. 1. Calculate Gianni‘s operating income in both 2016 and 2017. 2. Calculate the growth, price-recovery, and productivity components that explain the change in operating income from 2016 to 2017. 3. C
> The Magill Repair Shop repairs and services machine tools. A summary of its costs (by activity) for 2017 is as follows: a. Materials and labor for servicing machine tools………….$1,100,000 b. Rework costs………………………………………………………………….90,000 c. Expediting costs
> Justin Anders is the management accountant for Carey Restaurant Supply (CRS). Sara Brinkley, the CRS sales manager, and Justin are meeting to discuss the profitability of one of the customers, Donnelly’s Pizza. Justin hands Sara the following analysis of
> Carl Hart decides that the simple regression analysis used in Problem 10-47 could be extended to a multiple regression analysis. He finds the following results for two multiple regression analyses: The coefficients of correlation between combinations of
> Perfect Fit operates a chain of 10 retail department stores. Each department store makes its own purchasing decisions. Carl Hart, assistant to the president of Perfect Fit, is interested in better understanding the drivers of purchasing department costs.
> Nandita Summers works at Modus, a store that caters to fashion for young adults. Nandita is responsible for the store’s online advertising and promotion budget. For the past year, she has studied search engine optimization and has been
> Inbee is concerned that she still does not understand the relationship between output and labor consumption. She consults with Jim Park, the head of engineering, and shares the results of her regression estimation. Jim indicates that the production of ne
> Hankuk Electronics started production on a sophisticated new smartphone running the Android operating system in January 2017. Given the razor-thin margins in the consumer electronics industry, Hankuk’s success depends heavily on being a
> After further discussion, Julie and Rhett wonder if they should view both the number of procedures and number of patient-hours as cost drivers in a multiple regression estimation in order to best understand Apollo’s medical supplies cos
> Apollo Hospital specializes in outpatient surgeries for relatively minor procedures. Apollo is a nonprofit institution and places great emphasis on controlling costs in order to provide services to the community in an efficient manner. Apolloâ€
> Assume the same information for the Pacific Boat Company as in Problem 10-40 with one exception. This exception is that Pacific Boat uses a 90% incremental unit-time learning model as a basis for predicting direct manufacturing labor-hours in its assembl
> The Pacific Boat Company, which is under contract to the U.S. Navy, assembles troop deployment boats. As part of its research program, it completes the assembly of the first of a new model (PT109) of deployment boats. The Navy is impressed with the PT109
> Gianni & Sons buys T-shirts in bulk, applies its own trendsetting silk-screen designs, and then sells the T-shirts to a number of retailers. Gianni wants to be known for its trendsetting designs, and it wants every teenager to be seen in a distinctiv
> Spirit Freightways is a leader in transporting agricultural products in the western provinces of Canada. Reese Brown, a financial analyst at Spirit Freightways, is studying the behavior of transportation costs for budgeting purposes. Transportation costs
> Sleep Late, a large hotel chain, has been using activity-based costing to determine the cost of a night’s stay at their hotels. One of the activities, “Inspection,” occurs after a customer has checked
> Catherine McCarthy, sales manager of Baxter Arenas, is checking to see if there is any relationship between promotional costs and ticket revenues at the sports stadium. She obtains the following data for the past 9 months: She estimates the following re
> Market Thyme, a cooperative of organic family-owned farms, has recently started a fresh produce club to provide support to the group’s member farms and to promote the benefits of eating organic, locally produced food. Families pay a sea
> Fashion Fabrics makes pants from a special material. The fabric is special because of the way it fits many body types. The pants sell for $142. A well-known retail establishment has asked Fashion Fabrics to produce 3,000 shorts from the same fabric. The
> Diamond Corporation produces baseball bats for kids that it sells for $37 each. At capacity, the company can produce 54,000 bats a year. The costs of producing and selling 54,000 bats are as follows: Required: 1. Suppose Diamond is currently producing a
> Scott Company manufactures a DVD player called Orlicon. The company sells the player to discount stores throughout the country. This player is significantly less expensive than similar products sold by Scott’s competitors, but the Orlicon offers just DVD
> Precision Laboratories evaluates the reaction of materials to extreme increases in temperature. Much of the company’s early growth was attributable to government contracts, but recent growth has come from expansion into commercial markets. Two types of t
> Georgia Temps, a large labor contractor, supplies contract labor to building-construction companies. For 2017, Georgia Temps has budgeted to supply 84,000 hours of contract labor. Its variable costs are $13 per hour, and its fixed costs are $168,000. Rog
> C & S Mechanical sells and services plumbing, heating, and air-conditioning systems. C & S’s cost accounting system tracks two cost categories: direct labor and direct materials. C & S uses a time-and-materials pricing syste
> The TechGuide Company produces and sells 7,500 modular computer desks per year at a selling price of $750 each. Its current production equipment, purchased for $1,800,000 and with a five-year useful life, is only two years old. It has a terminal disposal