Question: Fatma settled down for lunch at the


Fatma settled down for lunch at the Yank Sing Chinese restaurant. She was early and took the time to catch up on her e-mail. Soon she would be joined by Jasper and Viktoria, two fellow 2014 grads from Virginia Tech in Blacksburg, Virginia.
Jasper worked as a software engineer for a start-up company that wanted to expand the boundaries of sharing economy. Viktoria was an electrical engineer who worked for a German healthcare company in San Francisco. They had met each other at a Silicon Valley alumni reception hosted by Virginia Tech. Each of them felt a bit like a fish out of water on the West Coast, so they decided to have lunch together each month. The lunch evolved into a professional support group. A major part of each of their jobs was managing projects, and they found it useful to share issues and seek advice from each other.
Fatma worked for a very successful Internet company whose founders believed that everyone in the firm should devote three days a year to community service projects. The company was partnering with several companies in the construction industry to renovate abandoned buildings for low income families. The next project was the renovation of an empty warehouse into eight two-bedroom apartments. Fatma was part of the core team in charge of scheduling and managing work assignments.
Viktoria and Jasper entered the restaurant together. Viktoria was the first to move to the Bay area. She was currently working on the next-generation neural stimulator (“PAX 2”). Neural stimulators are electronic devices that doctors implant in patients with wires connected to sources of pain in the patient’s spine. In the past, patients would have to have an operation to replace the stimulator battery every 10 years. PAX 2 was being designed to take advantage of new battery technologies and use a rechargeable battery. In concept, this battery system would eliminate the need for replacement surgeries and allow the implanted battery to be recharged externally. Viktoria’s team had just completed the second prototype and was entering a critical testing phase. It had been tricky trying to predict the life span of the new rechargeable battery without testing it in real time. She was anxious to begin seeing the test results.
Jasper was working for a start-up company after doing contract work for his first nine months in San Francisco. He was sworn to secrecy about the project and all Fatma and Viktoria knew was that the project had something to do with sharing economy. He was working with a small development team that included colleagues from Bangalore, India, and Malmo, Sweden.
After ordering and chit-chatting a bit, Fatma started the discussion. “I will be glad when this week is over,” she said. “We’ve been struggling defining the scope of the project. At first glance our project seems relatively simple, build eight two-bedroom apartments in an old warehouse. But there are a lot of unanswered questions. What kind of community space do we want to have? How efficient should the energy system be? What kind of furniture? Everybody wants to do a good job, but when does low income housing morph into middle income housing?”
Viktoria offered, “Scope defining is one of the things my company does very well. Before a project is authorized, a detailed scope statement is developed that clearly defines the project objectives, priorities, budget, requirements, limits, and exclusions. All of the key stakeholders sign off on it. It is really important to identify priorities up front. I know on the PAX 2 project that scope is the number one priority. I know no matter how long it takes it is imperative that my work is done right.”
Fatma responded, “That’s exactly what my Project manager is preparing for Friday’s meeting. I guess that is one of the things you have to do as a project manager is end discussions. He is going to make the tough calls and finalize the project scope so we can begin planning.”
Jasper interjected, “You guys are so lucky, for the most part your scope remains the same. In my work the scope is constantly changing. You show the founders a feature they wanted, and they say well if you can do that, can you do this? You know it’s going to happen, but you really can’t plan for it.”
Jasper went on to say, “We do know what our number one priority is: time. There are a lot of players trying to move in to the ‘space’ we are working on. We have to demonstrate we are ahead of the pack if we are going to continue to get VC funding.”
Jasper said that despite the pressure, his project had been a lot of fun. He especially liked working with his Swedish and Indian counterparts, Axel and Raja. They worked like a global tag team on their part of the project. Jasper would code and then pass his work onto Raja who would work on it and pass it on to Axel, who would eventually hand it off to Jasper. Given the time zones, they were able to have at least one person working on the code around the clock.
Jasper said it was hard at first working with someone you never met personally other than on a video screen. Trust was an issue. Everyone was trying to prove themselves. Eventually a friendly competition arose across the team. The programmers exchanged funny cartoons and YouTube videos. He showed Fatma and Viktoria a YouTube video about scope creep that got a chuckle from everyone.
They made plans to meet next at the New Peruvian restaurant on SE 8th Street.

PART B

The Peruvian cilantro/lime ceviche was a big hit at the next lunch. Viktoria began their discussion by reporting, “I have good and bad news. The bad news is that our first prototype failed its tests miserably. The good news is that I have a smart project manager. She knew this could happen, so she mitigated the risk by having us working on two alternative battery technologies. The alternative technology is passing all of the tests. Instead of falling behind months we are only days behind schedule.”
This precipitated a discussion of risk management. Fatma reported that there had been a two-day session on risk management for the renovation project. They spent the first day brainstorming what could go wrong, and the second day coming up with strategies for dealing with risks. A big help was the risk report that was generated after the last project. The report detailed all of the problems that had occurred on the last renovation project as well as recommendations. Fatma said, “I couldn’t believe how much time and attention was devoted to safety, but as my project manager said, ‘all it takes is one bad accident to shut down a project for weeks, even months.’ ”
Jasper reported that on his project they spent very little time on risk management. His project was driven by a build-test mentality. “Everybody assumes that daily testing eliminates problems, but when it’s time to integrate different features, that’s when the real bugs will emerge,” Jasper said. Jasper went on to say that things were not going well at work. They had missed their second straight milestone, and everyone was feeling the pressure to show results. “I even slept by my cubicle three nights ago,”
Jasper confessed. Fatma asked, “How many hours are you working?” “I don’t know, at least 70, maybe 80 hours,” Jasper answered. He went on to say, “This is a high stakes project, with a BIG upside if successful. I am doing some of my best programming and we’ll just have to see what happens.” Jasper showed them a cartoon that was being circulated across his team. The caption read: “When did you want it done? Yesterday.”
Fatma turned to her friends and said, “I need some advice. As you know I’m responsible for scheduling work assignments. Well, some of my colleagues have been pretty aggressive lobbying for choice assignments. Everyone wants to work alongside Bruno or Ryan. Suddenly I am everyone’s friends, and certain people are going way out of their way to do favors for me. I am sure they think it will influence my decisions. It’s getting awkward and I am not sure what to do.”
“Quid pro quo,” answered Jasper, “that’s how the business world works. You scratch my back and I’ll scratch yours. Within reason, I don’t have a problem with someone taking advantage of their position to garner favors and build relationships.”
Viktoria said, “I disagree. You don’t want to be seen as someone whose influence can be bought. You need to think what’s best for the company. You need to ask yourself what would Bruno and Ryan want you to do? And if you don’t know, ask them.”
After much discussion, Fatma left the restaurant leaning towards Viktoria’s advice, but she wasn’t sure what the guidelines should be.

PART C

It took two months for the Hokie lunch group to get together again. Jasper had canceled the last meeting because of work, so Viktoria and Fatma saw a movie together insteadJasper was the last person to arrive and it was clear from the look on his face that things were not going well. He sat down, avoided eye contact, before blurting, “I’m out of work.” “What do you mean?” Fatma and Viktoria cried. Jasper explained after months and months of work they had been unable to demonstrate a functional product.
Jasper went on to say, “Despite our best efforts we couldn’t deliver. The founders couldn’t get an ounce of second round venture funding, so they decided to cut their losses and kill the project. I just spent the best six months of my programming life for nothing.”
Fatma and Viktoria tried to comfort their friend. Fatma asked Jasper how the others were taking the news. Jasper said the Swedish programmer, Axel, took the news very hard. He went on to say, “I think he was burning a lot of bridges at home with the long work hours and now he has nothing to show for it. He started blaming us for mistakes we never made.” Raja, his Indian counterpart, was a different story. “Raja seemed to shrug his shoulders.” Jasper added, “He said, I know I am a good programmer. There are lots of opportunities here in Bangalore.”
Fatma broke the silence that followed by saying to Jasper, “Send me your resume. My company is always looking for top notch programmers and it is a really great company. Can you believe it, the two founders, Bruno and Ryan, are working side by side with everyone on renovating the warehouse? In fact, people were amazed at how good Bruno was with sheet rock. A big part of my job now is scheduling their time so they can work with as many different people as possible. They really want to use the project to get to know their employees. This hasn’t been easy. I have had to juggle their calendars, their abilities, and work opportunities.”
Viktoria interjected, “You’re using Microsoft Project to do this?” “Not really,” responded Fatma. “At first I tried scheduling their work in Project, but it was too cumbersome and time consuming. Now I just use the Project master schedule and each of their calendars to schedule their work. This seems to work best.”
Viktoria added, “Yeah, Microsoft Project is a great program, but you can get lost trying to get it to do everything. Sometimes all you need is an Excel sheet and common sense.”
Viktoria felt awkward, given what had happened to Jasper. She was just wrapping up the successful PAX 2 project. She was also getting ready for a well-deserved holiday in Vietnam paid for by her project bonus. “I hate closing out a project,” Viktoria said. “It’s so boring. Document, document, document! I keep kicking myself for not tracking things when they happened. I am spending most of my time scouring my computer for files. I can’t wait to take off to Vietnam.”
Viktoria went on to say, “The only thing I liked doing was the project retrospective.”
Jasper asked, “What’s a project retrospective?” Viktoria answered, “It’s when the project team gets together and reviews what went well, what didn’t, and identifies lessons learned that we can apply to future projects. For example, one of the things we learned was that we needed to bring the manufacturing people on board a lot sooner in the design process. We focused on designing the very best product possible, regardless of cost. We found out later that there were ways for reducing production costs without compromising quality.”
Fatma added, “We do that too at the end of our projects, but we call it an audit.”
Fatma asked Viktoria, “Do you know what your next assignment will be?” “No,” she replied, “I will probably go back to my department and do some testing. I’m not worried. I did good work. I am sure someone will want me for their project.”
Jasper chimed in, “I sure hope someone wants me for their next project.” Fatma and Viktoria immediately went into action trying to lift their friend’s spirits. A little while later, they walked out of the Tapa restaurant and gave each other hugs. Fatma reminded Jasper to send her his latest resume.

1. For each part (A, B, C), what phase of the project life cycle is each project in? Explain.
2. What are two important things you learned about working on projects from the case? Why are they important?


> Compute the early, late, and slack times for the activities in the network that follows, assuming a time-constrained network. Which activities are critical? What is the time-constrained project duration? Recall, in the schedule resource load chart the

> Why does the priority system described in this chapter require that it be open and published? Does the process encourage bottom-up initiation of projects? Does it discourage some projects? Why?

> The portfolio of projects is typically represented by compliance, strategic, and operations projects. What impact can this classification have on project selection?

> How are projects linked to the strategic plan?

> Describe the major components of the strategic management process.

> Discuss the pros and cons of the checklist versus the weighted factor method of selecting projects.

> Why should an organization not rely only on ROI to select projects?

> Pinyarat worked in the IT department of a diversified IT firm. She was describing the firm’s early encounters with critical-chain scheduling to a friend in another IT firm. Three years ago management decided to add 10 percent time to all activity estim

> In Chapter 6, Brian Smith, network administrator at Advanced Energy Technology (AET), was given the responsibility of implementing the migration of a large data center to a new office location. Careful planning was needed because AET operates in the hi

> International Capital, Inc. (IC), is a small investment banking firm that specializes in securing funds for small- to medium-sized firms. IC is able to use a standardized project format for each engagement. Only activity times and unusual circumstances c

> Why is it difficult to apply Agile PM to large-scale projects?

> What is iterative incremental development? Why is it useful for developing new products?

> Why is the traditional project management approach less effective when project scope and technology are not well known?

> What are the differences between a self-organizing team and a conventional project team?

> What similarities and differences exist between a traditional project manager and a Scrum master?

> You manage a hotel resort located on the South Beach on the Island of Kauai in Hawaii. You are shifting the focus of your resort from a traditional fun-in-the-sun destination to eco-tourism. (Eco-tourism focuses on environmental awareness and education.)

> What are the advantages of Agile PM? What are the disadvantages of Agile PM?

> You’ve just taken over a project from another project manager and have come back from a very uncomfortable meeting with your business sponsor. In the meeting, the sponsor told you how dissatisfied he is with the project’s performance to date and that he’

> Break into small groups and discuss the following question: What organizational, group, individual, and project factors do you think would promote the successful adoption of Agile PM methodologies like Scrum? Why?

> Kendra Hua had worked for six years as a software engineer in the IT department at Point 2 Point (P2P), a large freight moving company. She liked her job and the people she worked with. While she did some maintenance work, she worked primarily on project

> Why is it important to honor the customs and traditions of a country when working on an international project?

> What role do local intermediaries play in helping an outsider complete a project?

> How do environmental factors affect project implementation?

> How should you go about preparing yourself for an international project?

> What is culture shock? What can you do to reduce the negative effects of culture shock?

> Interview someone who has worked or lived in a foreign country for more than six months. a. What was his experience with culture shock? b. What did he learn about the culture of the country he lived in? c. What advice would he give to someone who woul

> The Custom Bike Company has set up a weighted scoring matrix for evaluation of potential projects. Below are five projects under consideration. a. Using the scoring matrix in the following chart, which project would you rate highest? Lowest? b. If the w

> Place in order the following countries in terms of what you would think would be the least to most corrupt: United States, Denmark, Saudi Arabia, Russia, Australia, Hong Kong, Nepal, China, Kenya, Indonesia, Botswana, Greece, Chile. Use an Internet sea

> Try as best you can to apply the Kluckhohn-Strodtbeck cross-cultural framework to the four countries discussed in this chapter: Mexico, France, Saudi Arabia, and China. Where do you think these countries lie on each of the cultural issues?

> Michael Thomas shouted, “Sasha, Tor-Tor, we’ve got to go! Our driver is waiting for us.” Thomas’s two daughters were fighting over who would get the last orange for lunch that day. Victoria (“Tor-Tor”) prevailed as she grabbed the orange and ran out the

> On December 26, 2004, an earthquake reaching 9.1 on the Richter scale triggered a series of devastating tsunamis off the coast of Indonesia. They spread throughout the Indian Ocean, killing large numbers of people and inundating coastal communities acros

> What major information would you expect to find in a project review?

> Why is it difficult to perform a truly independent, objective review?

> How does the project closure review differ from the performance measurement control system discussed in Chapter 13?

> Advocates of retrospective methodology claim there are distinguishing characteristics that increase its value over past lessons learned methods. What are they? How does each characteristic enhance project closure and review?

> Why should you separate performance reviews from pay reviews? How do you do this?

> Comment on the following statement: “We cannot afford to terminate the project now. We have already spent more than 50 percent of the project budget.”

> Given the time-phased work packages, complete the baseline budget form for the project. Time-phased budget ($ 000) Week 1 2 3 4 5 7 8 9 1O Task Budget o 6 Activity 1 4 4 13 2 2 4 2 2 Activity 2 6 Activity 3 10 Activity 4 2 3 3 8 Activity 5 3 2 1 Tot

> Consider a course that you recently completed. Perform a review of the course (the course represents a project and the course syllabus represents the project plan).

> What are some of the lessons learned from a recent project in your organization? Was a retrospective done? What action plans were generated to improve processes as a result of the project?

> Imagine you are conducting a review of the International Space Station project. Research press coverage and the Internet to collect information on the current status of the project. What are the successes and failures to date? What forecasts would you ma

> Olaf Gundersen, the CEO of Wireless Telecom Company, is in a quandary. Last year he accepted the Maximum Megahertz Project suggested by six up-and-coming young R&D corporate stars. Although Olaf did not truly understand the technical importance of the pr

> How does a tracking Gantt chart help communicate project progress?

> Schedule variance (SV) is in dollars and does not directly represent time. Why is it still useful?

> How does earned value give a clearer picture of project schedule and cost status than a simple plan versus actual system?

> On day 51 a project has an earned value of $600, an actual cost of $650, and a planned cost of $560. Compute the SV, CV, and CPI for the project. What is your assessment of the project on day 51?

> In month 9 the following project information is available: actual cost is $2,000, earned value is $2,100, and planned cost is $2,400. Compute the SV and CV for the project.

> How would a project manager use the CPI?

> Hector Gaming Company Hector Gaming Company (HGC) is an educational gaming company specializing in young children’s educational games. HGC has just completed their fourth year of operation. This year was a banner year for HGC. The company received a larg

> Why is it important for project managers to resist changes to the project baseline? Under what conditions would a project manager make changes to a baseline? When would a project manager not allow changes to a baseline?

> What are the differences between BAC and EAC?

> Given the following project network, baseline, and status information, develop status reports for periods 2, 4, 6, 8 and complete the performance indexes table. Calculate the EACf and the VACf. Based on your data, what is your assessment of the current s

> Given the project network and baseline information below, complete the form to develop a status report for the project at the end of period 4 and the end of period 8. From the data you have collected and computed for periods 4 and 8, what information are

> * Part A. You are in charge of the Aurora Project. Given the following project network, baseline, and status information, develop status reports for periods 1–8 and complete the performance indexes table. Calculate the EACf and VACf. Ba

> The following data have been collected for a British health care IT project for two week reporting periods 2 through 12. Compute the SV, CV, SPI, and CPI for each period. Plot the EV and the AC on the summary graph provided. Plot the SPI, CPI, and PCIB o

> The following labor hours data have been collected for a nanotechnology project for periods 1 through 6. Compute the SV, CV, SPI, and CPI for each period. Plot the EV and the AC on the summary graph provided (or a similar one). Plot the SPI, CPI, and PCI

> Wil Fence is a large timber and Christmas tree farmer who is attending a project management class in the spring, his off season. When the class topic came to earned value, he was perplexed. Isn’t he using EV? Each summer Wil hires crews to shear fields o

> Scanner Project You have been serving as Electroscan’s project manager and are now well along in the project. Develop a narrative status report for the board of directors of the chain store that discusses the status of the project to da

> Assume you are a member of a class on project management. Each student will join a team of 5–7 students who will be responsible for creating, planning, and executing a fund raising project for a designated charity. The fund raising proj

> You are an assistant to Percival Young, president of G&L Construction. He has asked you to prepare a brief report on the status of the Shoreline Stadium project. Shoreline stadium is a 47,000-seat professional baseball stadium. Construction started

> Given the information provided for development of a catalog product return process for periods 1 through 5, assign the PV values (using the rules) to develop a baseline for the project. Compute the SV, CV, SPI, and CPI for each period. Explain to the own

> Given the information provided for development of a product warranty project for periods 1 through 7, compute the SV, CV, SPI, and CPI for each period. Plot the EV and the AC on the PV graph provided. Explain to the owner your assessment of the project a

> What does the term “escalate” refer to, and why is it essential to project success?

> What are the best practices used by firms to outsource project work?

> Why do firms outsource project work?

> How can a project manager influence customer expectations and perceptions?

> What does the acronym BATNA refer to and why is it important to being a successful negotiator?

> Why is the principled negotiation approach recommended for negotiating agreements on projects?

> Break into groups of four to five students. Assign half of the groups the role of Owner and the other half the role of Contractor. Owners: After saving for many years you are about to hire a contractor to build your “dream home.” What are your objective

> The National Oceanic Research Institute is planning a research study on global warming in Antarctica. The 16-month network schedule is presented below. It is followed by budgets for each activity. Create a time-phased budget for the research project in t

> Sitting in her office, Karin Chung is reviewing the past four months of the large corporate accounting software installation project she has been managing. Everything seemed so well planned before the project started. Each company division had a task for

> Shell Case Fabricators (SCF) designs and builds shell casings that enclose electronic products such as calculators, cell phones, modems. Typically the cases are plastic or plastic compounds. SCF has six different production lines that cover different ty

> Goldrush Electronics (GE) produces a range of electronic products. GE has a strong commitment to project management. GE operates as a projectized organization with each project organized as a fully dedicated team. The compensation system is based on a 40

> Chad Cromwell, head of university housing, gazed up at the tower at Buxton Hall and smiled as he walked toward the landmark building. Buxton Hall was built in 1927 as a residential complex for over 350 students at Pacifica State University. At the time B

> For what kinds of projects would you recommend that a fixed-price contract be used? For what kinds of projects would you recommend that a cost-plus contract be used?

> What are the fundamental differences between fixed-price and cost-plus contracts?

> What are the elements of an effective project vision? Why are they important?

> What are the differences between the five-stage model of team development and the punctuated equilibrium model?

> What can a project manager do to avoid some of the pitfalls of a highly cohesive project team?

> What are the unique challenges of managing a virtual project team?

> The technical and sociocultural dimensions of project management are two sides to the same coin. Explain.

> When would it be appropriate to hold a formal team-building session on a project?

> What is the difference between functional and dysfunctional conflict on a project?

> Why should a project manager emphasize group rewards over individual rewards?

> Assume that you have the following decision-making options: (1) make the decision on your own with available information, (2) consult others before making a decision, and (3) call a meeting and reach a consensus, seeking to arrive at a final decision eve

> Amber Briggs looked nervously at her watch as she sat at the front of a large table in the cafeteria at Kerzner Office Equipment. It was now 10 minutes after 3:00 and only 10 of the 14 members had arrived for the first meeting of the Kerzner anniversary

> Franklin Equipment, Ltd. (FEL), with headquarters and main fabrication facilities in Saint John, New Brunswick, was founded 75 years ago to fabricate custom-designed large machines for construction businesses in the Maritime Provinces. Over the years its

> Tran was taking his dog Callie on her evening walk as the sun began to set over the coastal range. He looked forward to this time of the day. It was an opportunity to enjoy some peace and quiet. It was also a time to review events on the Ajax project an

> Why is it critical to keep the project sponsor informed?

> What does the exchange model of influence suggest you do to build cooperative relationships to complete a project?

> Why is a conductor of an orchestra an appropriate metaphor for being a project manager? What aspects of project managing are not reflected by this metaphor? Can you think of other metaphors that would be appropriate?

> What are some of the key environmental forces that have changed the way projects are managed? What has been the effect of these forces on the management of projects?

> What is the difference between leading and managing a project?

> Why is trust a function of both character and competence?

> Why is it important to build a relationship before you need it?

> What differences would you expect to see between the kinds of influence currencies that a project manager in a functional matrix would use and the influence a project manager of a dedicated project team would use?

> You are the project manager for the Seaburst construction project. So far the project is progressing ahead of schedule and below budget. You attribute this in part to the good working relationship you have with the carpenters, plumbers, electricians, and

> You returned from a project staffing meeting in which future project assignments were finalized. Despite your best efforts, you were unable to persuade the director of project management to promote one of your best assistants, Jack Nietzche, to a project

> You are managing the renovation of the Old Princeton Landing Bar and Grill. The project is on schedule despite receiving a late shipment of paint. The paint was supposed to arrive on 1/30, but instead arrived on 2/1. The assistant store manager apologize

> You are a test engineer on the Bridge project at Ryman Pharmaceuticals in Nashville, Tennessee. You have just completed conductivity tests of a new electrochemical compound. The results exceeded expectations. This new compound should revolutionize the in